images

National Strategy For General Management Of Solid Waste To 2025 With Vision Towards 2050 (adjusted)

  • Category:

    Program

  • Keyword:

    solid waste

  • Stage:

    2009 - 2025

  • National Partners:

    GoVN

  • International Partners:

  • Contact

Brief Innovation

Specific objectives to 2025: - Regarding hazardous solid waste: + 100% of total amount of hazardous solid waste generated from production, business and service activities, medical establishments and craft villages must be collected, transported and treated to meet environmental protection requirements; + 85% of hazardous solid waste generated in households and individuals must be collected, transported and treated to meet environmental protection requirements; + 100% of electronic equipment manufacturers must establish and publish waste disposal sites in accordance with the law. - Regarding urban solid waste: All special and grade I municipalities must have solid waste recycling works in accordance with household classification; 85% of the remaining urban areas have solid waste recycling facilities in line with household classification; + 90% of total daily-life solid waste generated in urban centers shall be collected and treated to meet environmental protection requirements; enhance ability to recycle, reuse, recycle, recycle or produce organic fertilizers; To strive for rate of daily-life solid waste treated by direct burial methods to reach rate of under 30% of collected wastes; + To use 100% eco-friendly plastic bags at trade centers and supermarkets for domestic purposes to replace biodegradable plastic bags; + 90-95% of closed burying landfills in urban centers shall be renovated, treated and reused; + Investment in the construction of daily-life solid waste treatment establishments shall ensure that burial rates shall not exceed 20% after handling.

Overview

Category: Program
Keyword: solid waste
Donner:

GoVN

National Partners: GoVN
International Partners:
Location(s) in Vietnam: Country level
Location(s) in Other countries:
Stage: 2009 - 2025
Total budget:

Lorem Ipsum

Metrics/ diagnostics

Innovation

Policy advice

Capacity building

Investment/ financing

Public awareness/ outreach

Private sector development

GESI